...
首页> 外文期刊>Indian journal of power and river valley development >Planned development of electric power in India
【24h】

Planned development of electric power in India

机译:印度电力的计划开发

获取原文
获取原文并翻译 | 示例
           

摘要

Right from the very beginning of the power development under budgetary provisions of the Government in 1951, programme and funding of power development in the country was carried out under the complete Government control. With the increase in volume of the work and increasing demand of electricity for industry, irrigation, and commercial sectors the Government opened power development work to private sector in 1991 to mobilize additional funds, Legislative measures were taken to make favourable environment for such participation. Central sector, state sector and private sector, are now playing major role in development of power industry in the country.
机译:从1951年根据政府预算拨款进行电力开发之初,该国的电力开发计划和资金就在政府的完全控制下进行。随着工作量的增加以及对工业,灌溉和商业部门的电力需求的增加,政府于1991年向私营部门开放了电力开发工作,以筹集更多资金,政府采取了立法措施,为此类参与创造了有利的环境。中央部门,国有部门和私营部门现在在该国电力工业的发展中起着重要作用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号