Computation of fundamental time period of concrete gravity dam - A parametric study

机译:混凝土重力坝基本周期计算-参数研究。

获取原文
获取原文并翻译 | 示例
           

摘要

A parametric study is conducted with the objective to find the dependency of fundamental time period of the concrete gravity dam on its base width, height and slopes on upstream and downstream faces. Two dimensional studies are conducted on 353 geometric variables of dam with rigid foundation using general purpose finite element software. Time period calculated for different alternatives of the dam are compared with those calculated using empirical equation of Indian Standard and as per published literature. Results obtained through different methods are in good agreement when base to height ratios are in the range of 0.7 to 0.8.
机译:进行参数研究的目的是找到混凝土重力坝基本时间段对其上游,下游面的基础宽度,高度和坡度的依赖性。使用通用有限元软件对353个具有刚性基础的大坝几何变量进行了二维研究。根据不同的水坝替代方案计算出的时间段,与使用印度标准的经验公式和根据已发表的文献计算出的时间段进行比较。当底高比在0.7到0.8范围内时,通过不同方法获得的结果非常吻合。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号