首页> 外文期刊>Hydro review >A Review of 2008 FERC Filings: Hydro Development Interest on the Rise
【24h】

A Review of 2008 FERC Filings: Hydro Development Interest on the Rise

机译:2008 FERC申请回顾:水电开发的兴趣在上升

获取原文
获取原文并翻译 | 示例
           

摘要

A review of Federal Energy Regulatory Commission preliminary permits issued during 2008 reveals proposed hydro development of more than 15,000 MW. The number of preliminary permits filed is expected to continue to increase in 2009, given the federal government's support for renewables.rnSpurred by federal and state incentives, U.S. developers proposed hundreds of new or expanded hydroelectric projects to the Federal Energy Regulatory Commission (FERC) during 2008. Many of the notices and orders issued by FERC were for hydrokinetic projects proposed for the Mississippi, Missouri, and Ohio rivers, and for offshore ocean sites.
机译:对2008年发布的联邦能源管理委员会初步许可的审查显示,拟议的水电开发量超过15,000兆瓦。鉴于联邦政府对可再生能源的支持,2009年初步许可的申请量预计将继续增加。在联邦和州的激励措施的推动下,美国开发商在2006年期间向联邦能源管理委员会(FERC)提出了数百个新的或扩建的水电项目。 2008年。FERC发出的许多通知和命令都是针对为密西西比河,密苏里河和俄亥俄河以及近海站点提议的水动力项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号