INSTALLING FLUE & CHIMNEY SYSTEMS IN SCHOOLS

机译:在学校安装烟道和烟囱系统

获取原文
获取原文并翻译 | 示例
           

摘要

A1 Flue Systems is already gearing up for this year's school summer holidays as it's the busiest time of year for installations, refits and maintenance projects. Last summer, the company completed projects totalling £850,000 in a frantic six-week period. Here managing director John Hamnett looks at some of the key factors that the team at the North Nottinghamshire-based company has to deal with to deliver such a large number of projects in such a short space of time. As a specialist in the design, manufacture, installation and maintenance of commercial and industrial chimney, flue and exhaust systems - it's often the big, high-profile projects, such as the one we're working on at Battersea Power Station, that tend to grab the headlines. But, in actual fact, it's all the bread-and-butter projects for hotels, office and apartment blocks, public buildings and schools that make up the bulk of what we do. Because we know there are set windows for working at schools and other educational establishments, we plan well in advance as we know that summer, Easter and Christmas breaks plus the half-term weeks get blocked out, so we can maximise the time we have to fulfil these contractors.
机译:A1 Flue Systems已经准备好今年的学校暑假,因为它是一年中安装,改装和维护项目最繁忙的时间。去年夏天,该公司在一个疯狂的六周内完成了总计850,000英镑的项目。在这里,常务董事John Hamnett研究了位于北诺丁汉郡的公司的团队必须处理的一些关键因素,以便在短时间内交付如此众多的项目。作为商业和工业烟囱,烟道和排气系统的设计,制造,安装和维护的专家,通常是大型的,备受瞩目的项目,例如我们在巴特西电站正在研究的项目,抢头条。但是,实际上,构成我们工作的绝大部分是酒店,写字楼和公寓楼,公共建筑和学校的一切生计。因为我们知道在学校和其他教育机构有固定的工作窗口,所以我们提前做好周密的计划,因为我们知道暑假,复活节和圣诞节休息以及半个星期的时间会被推迟,因此我们可以最大限度地利用时间履行这些承包商。

著录项

  • 来源
    《Heating & Ventilating Review》 |2020年第4期|22-22|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号