...
首页> 外文期刊>Geografiska annaler >Financing large-scale renewable-energy projects in Kenya: investor types, international connections, and financialization
【24h】

Financing large-scale renewable-energy projects in Kenya: investor types, international connections, and financialization

机译:肯尼亚大型可再生能源项目的融资:投资者类型,国际联系和金融化

获取原文
获取原文并翻译 | 示例
           

摘要

As energy transitions are progressing and economies of scale are kicking in, renewable-electricity generation begins to include, and be dominated by, large-scale operations. This shift is accompanied by far-reaching changes in the ownership and financing structures of renewable-energy projects, involving connections and (inter)dependencies between international and domestic investors and policies. With growing sizes and maturity, renewable-energy projects are also increasingly taken to capital markets and have become subject to financialization. Until recently these processes have only been observed in the Global North but not in the Global South. So far there has been little research on renewable-energy financialization in the Global South, especially in Sub-Saharan Africa. In our paper we address this gap by exploring the international connections and (possible) financialization of two large-scale renewable-energy projects in Kenya. Based on case study analyses of geothermal and wind projects in Kenya, we argue that due to their complex risk structure, public investment and support, both from domestic sources and development finance institutions (DFIs), are and will remain key to facilitate or even enable such projects. In contrast to Baker's (2015) case-study on South Africa, we neither see nor expect financialization of large-scale renewable-energy projects in Kenya and most other Sub-Saharan African countries any time soon.
机译:随着能源转型的发展和规模经济的开始,可再生能源发电开始包括大规模运营,并受其主导。这种转变伴随着可再生能源项目所有权和融资结构的深刻变化,涉及国际和国内投资者与政策之间的联系和(相互)依赖性。随着规模和成熟度的不断提高,可再生能源项目也越来越多地进入资本市场,并且已经经历了金融化。直到最近,这些过程仅在全球北部地区才观察到,而在全球南部地区则没有观察到。到目前为止,在全球南方,特别是在撒哈拉以南非洲地区,有关可再生能源金融化的研究很少。在本文中,我们通过探讨肯尼亚的两个大型可再生能源项目的国际联系和(可能)金融化来解决这一差距。根据对肯尼亚地热和风能项目的案例研究分析,我们认为,由于其复杂的风险结构,来自国内来源和发展金融机构的公共投资和支持,将仍然是促进甚至实现发展的关键这样的项目。与贝克(2015)关于南非的案例研究相比,我们既没有看到也没有期望很快在肯尼亚和大多数其他撒哈拉以南非洲国家实现大规模可再生能源项目的融资。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号