The ITER transitional arrangements (ITA) is conducted by the International Team (IT) with supports from participant teams (PTs). The Japanese Participant Team (JA-PT) has contributed to the ITA by sharing a lot of technical tasks to verify feasibilities of fabrication and quality control method in procuring ITER equipments and facilities. For examples, trial fabrications of Nb_3Sn strands have been performed by the JA-PT with four potential suppliers, and it has already been confirmed that one of the strands produced by a certain supplier meet the ITER requirements. All strands produced by other suppliers will be fully qualified by the end of 2005. The trial fabrications of jackets for the central solenoid (CS), structural material for toroidal field coil, the partial mock-ups of the vacuum vessel (VV) and the shield blanket module are also ongoing to verify the feasibility of fabrications and quality inspections. Furthermore, the JA-PT has made several technical developments on neutral beam (NB) system to improve reliability in high voltage (1MV) insulation and in stable high current density operations over a long period. Design of equatorial EC launcher and some techniques towards reliable steady-state EC operation have been developed. The paper also describes other activities to confirm validity of the present design.
机译:ITER过渡安排(ITA)由国际团队(IT)进行,并由参与者团队(PTs)提供支持。日本参与者小组(JA-PT)通过分享大量技术任务来验证ITA的设备和设施的制造可行性和质量控制方法,从而为ITA做出了贡献。例如,JA-PT已与四个潜在的供应商一起进行了Nb_3Sn链的试制,并且已经确认某个供应商生产的链之一符合ITER要求。其他供应商生产的所有绞线将在2005年底前完全合格。中央螺线管(CS)的外套,环形磁场线圈的结构材料,真空容器(VV)的局部模型和真空容器的试制件均将通过测试。屏蔽毯模块也在进行中,以验证制造和质量检查的可行性。此外,JA-PT在中性束(NB)系统上进行了多项技术开发,以提高高压(1MV)绝缘和长期稳定的高电流密度操作的可靠性。已经开发了赤道EC发射器的设计以及实现稳定EC运行的一些技术。本文还介绍了其他活动,以确认本设计的有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号