首页> 外文期刊>Fusion Engineering and Design >Integration of the EU HCPB Test Blanket Module system in ITER
【24h】

Integration of the EU HCPB Test Blanket Module system in ITER

机译:在ITER中集成EU HCPB测试毯模块系统

获取原文
获取原文并翻译 | 示例
           

摘要

The integration of the HCPB Test Blanket Module (TBM) systems into ITER has been investigated with the aim to check the compatibility between the considered systems and ITER. In particular the requirement of a simple and quick TBM replacement is considered in this paper. It presents the systems and operations in hot cell and port cell for the integration and exchange of the four different TBMs in succession during operation into the ITER-circuits. This concept shows that TBM integration using three interfaces is a simple and quick way that is compatible with ITER environment and systems.
机译:已经对将HCPB测试毯模块(TBM)系统集成到ITER中进行了研究,目的是检查所考虑的系统与ITER之间的兼容性。特别是,本文考虑了简单,快速地更换TBM的要求。它介绍了在热室和端口单元中的系统和操作,用于在运行到ITER电路中的过程中依次集成和交换四个不同的TBM。该概念表明,使用三个接口进行的TBM集成是一种与ITER环境和系统兼容的简单快捷的方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号