Preparation of ITER construction and operation

机译:准备国际热核实验堆的建设和运营

获取原文
获取原文并翻译 | 示例
           

摘要

In parallel with negotiations on the Joint Implementation Agreement, which will establish the ITER Organisation, and on the future construction site, including the possibility of broadening the development approach, the ITER project is preparing on various technical fronts for a smooth start to construction. This technical preparation covers further development of the design, confirmation via R&D of fabrication methods and QA/QC of critical components, development of detailed technical specifications of long-lead items ready for call for tender (i.e. mainly magnets, vacuum vessel, and buildings), expansion of project infrastructural elements that will ease design management and control, and preparations for licensing. As part of preparation for the operation phase, developments are also underway to prepare for remote participation, and to incorporate the participation of participating laboratories worldwide in supply and operation of plasma heating and current drive systems, diagnostics and test blanket modules. This paper reviews the technical and organizational preparations for construction and operation, and the status of negotiations.
机译:在与将建立国际热核实验堆组织的联合执行协议的谈判以及在未来的建筑工地上进行谈判(包括扩大开发方法的可能性)的同时,国际热核实验堆项目正在各个技术领域进行准备,以期顺利开工。该技术准备包括设计的进一步开发,通过研发制造方法和关键部件的QA / QC进行确认,开发准备招标的长引线物品的详细技术规范(即主要是磁体,真空容器和建筑物) ,扩展项目基础结构元素以简化设计管理和控制以及许可准备工作。作为运行阶段准备工作的一部分,还正在进行开发工作,以准备远程参与,并将全球参与实验室的参与纳入等离子加热和电流驱动系统的供应和运行,诊断和测试平台模块。本文回顾了施工和运营的技术和组织准备以及谈判的现状。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号