...
首页> 外文期刊>Exchange >BEVAN SLATTERY GETS BEHIND NEW COMPANY BUILDING SUB CABLE
【24h】

BEVAN SLATTERY GETS BEHIND NEW COMPANY BUILDING SUB CABLE

机译:Bevan Slattery落后于新公司建筑船电缆

获取原文
获取原文并翻译 | 示例
           

摘要

SUB.CO announced on Thursday that its Oman Australia Cable (OAC) project has enteredContract In Force status (CIF) with its final system connection expected to be completed inDecember 2021.When completed it will deliver a new international subsea cable system that will directlyconnect Muscat, Oman to Perth, Australia.Bevan Slattery, founder of SUB.CO (pictured left) said, “Iam delighted that OAC is now CIF and importantly we havebeen able to secure the required manufacturing andmarine installation assets with SubCom to allow for atargeted 2021 completion date.
机译:周四宣布其阿曼澳大利亚电缆(OAC)项目已进入有效的合同状态(CIF),最终系统连接预计将完成2021年12月。完成后,它将提供直接的新国际海底电缆系统连接Muscat,阿曼到珀斯,澳大利亚。Sub.co的创始人(描绘左)的创始人说,“贝弗我很高兴OAC现在是CIF,重要的是我们有能够确保所需的制造和带有subcom的海洋安装资产允许a有针对性的2021年完成日期。

著录项

  • 来源
    《Exchange》 |2020年第6期|2-2|共1页
  • 作者

    Peter Dinham;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号