首页> 外文期刊>Environmental Geology >Analysis of ground surface settlement induced by a large EPB shield tunnelling: a case study in Beijing, China
【24h】

Analysis of ground surface settlement induced by a large EPB shield tunnelling: a case study in Beijing, China

机译:大型EPB盾构隧道施工引起的地表沉降分析:以中国北京为例

获取原文
获取原文并翻译 | 示例
           

摘要

Large size shield tunnels have been constructed with the increasing demands, because it offers cost efficiency in urban areas. One major problem created by shield tunnelling is that ground settlement occurs, which is crucial to existing structures. A detailed case study of surface settlement induced by the operation of a large-diameter earth pressure balance (EPB) shield tunnel in Beijing was presented. This study provides important new insights into the values of settlement trough parameters of empirical methods. The narrower transverse settlement trough was observed in large size tunnels. The development of longitudinal settlement can be divided into four stages, and methods were further proposed to assess the associated four components of volume loss. Results demonstrate that the proposed methods can efficiently predict the volume loss and the associated ground settlement within a reasonable accuracy by comparing with the collected field observations. In addition, a bandwidth of achievable surface settlement for future large EPB shield tunnels is suggested via performing analysis on real settlements.
机译:大型屏蔽隧道的建造需求不断增加,因为它在城市地区具有成本效益。盾构隧道施工带来的一个主要问题是地面沉降的发生,这对现有结构至关重要。提出了北京大直径土压平衡盾构隧道施工引起地表沉降的详细案例研究。这项研究为经验方法的沉降槽参数值提供了重要的新见解。在大型隧道中观察到较窄的横向沉降槽。纵向沉降的发展可分为四个阶段,并进一步提出了方法来评估体积损失的相关四个组成部分。结果表明,通过与收集的现场观测结果进行比较,所提出的方法可以在合理的精度范围内有效地预测体积损失和相关的地面沉降。此外,通过对实际沉降进行分析,提出了未来大型EPB盾构隧道可实现的地面沉降带宽。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号