...
首页> 外文期刊>Environmental Engineering Science >A Review of Past, Present, and Future Technologies for Permanent Plugging and Abandonment of Wellbores and Restoration of Subsurface Geologic Barriers
【24h】

A Review of Past, Present, and Future Technologies for Permanent Plugging and Abandonment of Wellbores and Restoration of Subsurface Geologic Barriers

机译:介绍过去,现在和未来技术,用于永久堵塞和遗弃Wellbores和恢复地质地质障碍

获取原文
获取原文并翻译 | 示例
           

摘要

Leakage of oil & gas during fossil fuel exploration, production, and transportation poses a major environmental challenge that impacts the quality of air, water, soil, and ultimately the life on Earth. The result of uncontrolled spills & leakages may cause the contamination of groundwater as well as methane emission into the atmosphere increasing global warming, while the spills in open waters in the case of offshore wellbores impact fragile marine ecosystems. The United States alone has similar to 1.7 million wellbores with an American Petroleum Institute (API) number indicating that they have not been permanently plugged and therefore require Plugging and Abandonment (P&A) in the future. However, there remain thousands of wells drilled before the 1950s that were not properly P&A. Improper P&A of boreholes are potential pathways for leakage as well as already existing leaky plugs. The objective of this literature review is to (1) assess subsurface conditions where P&A materials need to be placed, (2) assess the challenges encountered during barrier placement in wellbores under current P&A technologies, (3) appraise contaminations of barrier materials by drilling fluid and possible mitigation, and (4) discuss the future requirements of P&A materials and technology involved in restoring subsurface sealing barriers interrupted by drilling. The review indicates that to achieve permanent P&A in the future, two major challenges must be addressed: (1) innovation & improvement of the barrier materials, and (2) advancements and innovation of the placement methods. The major insight from this article is that re-establishment of a permanent seal capable of withstanding subsurface geomechanical and geochemical changes will involve engineered materials and processes providing sealing in the early stages (1-50 years) and geomaterials and geological processes take over and provide permanent seals, for thousands of years to geological times. Thus no single solution can be successful for future P&A campaigns.
机译:化石燃料勘探,生产过程中的石油和天然气泄漏构成了影响空气,水,土壤的质量的主要环境挑战,并最终影响地球上的生命。不受控制的溢出和泄漏的结果可能导致地下水的污染以及甲烷排放到大气中的全球变暖,而开放水域在海上·韦尔伯勒斯影响脆弱的海洋生态系统的情况下。仅美国的美国与美国石油研究所(API)号码相似,指示它们未被永久插入,因此未来需要堵塞和放弃(P&A)。然而,在20世纪50年代之前,仍有成千上万的井在不适合P&A之前钻探。钻孔不当是漏洞的潜在途径以及已经存在的漏洞。该文献综述的目的是(1)评估需要放置P&A材料的地下条件,(2)评估当前数据库技术下的Wellbores屏障禁区遇到的挑战,(3)通过钻井液评估阻隔材料的污染情况和可能的缓解,(4)讨论了通过钻井中断恢复地下密封屏障的P&A材料和技术的未来要求。审查表明,为了实现未来常驻项目,必须解决两大挑战:(1)屏障材料的创新和改善,以及(2)安置方法的进步和创新。本文的主要洞察力是重建能够承受地产地质力学和地球化学变化的永久性密封,将涉及在早期阶段(1-50岁)和地质工程接管和提供的工程材料和工艺。永久性密封,几千年到地质时间。因此,对于未来的P&A运动,没有单一解决方案可以成功。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号