首页> 外文期刊>Environment and Planning >Quantitative analysis of dynamic inconsistencies in infrastructure planning: an example of coastal levee improvement
【24h】

Quantitative analysis of dynamic inconsistencies in infrastructure planning: an example of coastal levee improvement

机译:基础设施规划中动态不一致的定量分析:沿海堤防改善示例

获取原文
获取原文并翻译 | 示例
           

摘要

Cost-benefit analysis is considered as an effective means for the government to avoid failures in public projects. However, once cost-benefit analysis becomes mandatory and residents expect a public project to be established based upon it, there is a potential for a dynamic inconsistency problem to arise, where dynamic inconsistency is defined as a difference in the optimal policy before and after a certain time. Taking as an example the coastal levee improvement policy in the city of Rikuzentakata in Japan, the present study clarifies the mechanism behind the dynamic inconsistency problem that is attributable to mandatory cost-benefit analysis and also discusses quantitatively the influence of the dynamic inconsistency problem on social welfare. In addition, through examining the quantitative result, we indicate that, in the projects where the improvement cost increases gradually with the scale, the inefficiency of the dynamic inconsistency problem is incurred on a larger scale.
机译:成本效益分析被认为是政府避免公共项目失败的有效手段。但是,一旦成本效益分析成为强制性措施,并且居民期望以此为基础建立公共项目,就有可能出现动态不一致问题,其中动态不一致被定义为最优政策前后的差异。一定的时间。以日本陆前高田市的沿海堤防改善政策为例,本研究阐明了强制性成本收益分析所导致的动态矛盾问题背后的机制,并定量讨论了动态矛盾问题对社会的影响。福利。此外,通过检查定量结果,我们表明,在改进成本随规模逐渐增加的项目中,动态不一致问题的效率较低。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号