首页> 外文期刊>Inside EPA's environmental policy alert >New York, GE Pressured To Support Further Dredging Of PCBs In Hudson
【24h】

New York, GE Pressured To Support Further Dredging Of PCBs In Hudson

机译:通用电气在纽约施压,要求在哈德森进一步疏通多氯联苯

获取原文
获取原文并翻译 | 示例
       

摘要

New York and General Electric (GE) are facing pressure from stakeholders to conduct more extensive dredging of toxic polychlorinated biphenyl (PCB) hotspots in the Hudson as GE nears the end of its more than $1 billion, six-year sediment cleanup of the river, with dredging advocates arguing it could help accelerate the cleanup. GE over the past six years has during the warmer half of each year been dredging the Upper Hudson River to remove more than 2.6 million cubic yards of sediment contaminated with PCBs stemming from two electrical capacitor manufacturing plants that operated along the river for decades, according to the company. EPA required the Superfund cleanup, estimating that GE had discharged 1.3 million pounds of PCBs into the river. The Hudson River dredging project is widely considered unprecedented in terms of the scope of contamination and technical challenges it involves, with GE claiming it is one of the biggest and most "logistically complex" cleanups in the country's history.
机译:纽约和通用电气(GE)面临利益相关者的压力,因为通用电气(GE)耗资10亿美元,为期6年的河流底泥清理工作已接近尾声,将在哈德逊进行有毒多氯联苯(PCB)热点的更广泛疏dr工作,与疏ging倡导者争辩说,它可以帮助加快清理速度。据GE称,在过去的六年中,GE在每年的上半年都在疏Hu上哈德逊河,清除了260万立方码的沉积物,这些沉积物被沿河经营了数十年的两家电容器制造厂所污染,而PCB被污染。公司。 EPA要求对Superfund进行清理,估计GE已向河中排放了130万磅的PCB。就污染范围和所涉及的技术挑战而言,哈德逊河疏project工程被广泛认为是史无前例的,GE称这是该国历史上规模最大,最“后勤复杂”的清理工作之一。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号