...
首页> 外文期刊>Engineers Australia >National Office building nears completion
【24h】

National Office building nears completion

机译:国家办公大楼即将竣工

获取原文
获取原文并翻译 | 示例
           

摘要

Redevelopment of the National Office building, Engi-neering House, at 11 National Circuit in Canberra has proved to be a protracted affair. Substantial delays have occurred and I want to update you on the outcomes. The former deputy chief executive, Bill Crews wrote an article on the background to the building redevelopment in the August 2001 issue of Engineers Australia. He explained that the original proposal to redevelop the building envisioned Engineers Australia having refurbished office space of 1805m~2. Council resolved that the Institution should own a controlling interest of the titles in its own building - namely 51% - and this implied taking ownership of another 792m~2 at a total cost of $2.45 million, including the much needed refurbishment of the existing lower two floors.
机译:堪培拉国家巡回赛11号国家办公大楼Engi-neering House的重建被证明是旷日持久的事情。发生了实质性的延误,我想向您介绍结果。前副首席执行官比尔·克鲁斯(Bill Crews)在2001年8月的澳大利亚工程师杂志上发表了有关建筑物重建背景的文章。他解释说,重建该建筑的最初建议是澳大利亚工程师协会(Engineers Australia)翻新的办公空间1805m〜2。理事会决定该机构应在其自己的建筑物中拥有所有权的控制权(即51%),这意味着以总成本245万美元获得另外792m〜2的所有权,其中包括急需的现有下两座建筑物的翻新工程地板。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号