首页> 外文期刊>Engineers Australia >Improve initiation to prevent failure
【24h】

Improve initiation to prevent failure

机译:改善启动以防止失败

获取原文
获取原文并翻译 | 示例
           

摘要

The successful delivery of megaprojects is the exception and not the norm. Contemporary wisdom points to the systematic failure to adequately structure and define the project in the initiation phase, leading to the manifestation of significant risk in the delivery phase. We need to overcome our industry's obsession with mobilising tangible physical delivery as early as possible at the expense of considered and structured project initiation. The failure rate of megaprojects is certainly a compelling argument that something has to change.
机译:大型项目的成功交付是例外,而不是常规。当代的智慧指出,在启动阶段无法适当地组织和定义项目会导致系统性失败,从而导致在交付阶段出现重大风险。我们需要克服行业的困扰,即尽早动员有形的实物交付,但要以考虑周全和结构化的项目启动为代价。大型项目的失败率无疑是一个令人信服的论点,认为某些事情必须改变。

著录项

  • 来源
    《Engineers Australia》 |2013年第7期|52-53|共2页
  • 作者

    Darren Vaux;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号