首页> 外文期刊>Engineers Australia >Contract supervision obligations
【24h】

Contract supervision obligations

机译:合同监督义务

获取原文
获取原文并翻译 | 示例
           

摘要

The Supreme Court of NSW recently applied the controversial rule that the amount a party can recover for damages for defective work is not diminished by a subsequent sale of the asset in question. In the case Bannister & Hunter v Transition Resort Holdings (No.2) [2013] NSWSC 1943, the Supreme Court of NSW found that a capping layer and a layer of fill which were placed on a development site in NSW departed substantially from specification as a result of the project manager failing to take reasonable steps to ensure that a consultant supervised the works.
机译:新南威尔士州最高法院最近应用了有争议的规则,即当事方随后出售有关资产不会减少当事方可以为缺陷工程造成的损害赔偿的金额。在Bannister&Hunter诉Transition Resort Holdings(No.2)[2013] NSWSC 1943一案中,新南威尔士州最高法院裁定,放置在新南威尔士州开发场地上的封盖层和填充层与规范基本背道而驰。项目经理未能采取合理步骤来确保顾问对工程进行监督的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号