Transformer loading analyses and computer simulations of transformer thermal behaviour under realistic/typical operating conditions (loading and ambient-temperature profiles) indicate that substation (DS) power transformers in Ontario Hydro can be loaded to 1.8-1.9 p.u. Of the ratings during annual (winter) peak load periods without sacrifice of normal transformer life expectancy or reliability of supply to achieve the goal of making the best use of transformer capabilities. Adoption of the proposed increases in loading limits will result in a significant cost saving for Ontario Hydro, estimated at $4,500,000 (NPV 1991 Canadian dollars) over three years (of a reduction of $10,000,000 per year on DS capital cost).
机译:在实际/典型运行条件下的变压器负载分析和变压器热行为的计算机模拟(负载和环境温度曲线)表明,安大略水电公司的变电站(DS)电力变压器可以负载至1.8-1.9p.u。在年度(冬季)峰值负荷期间的额定功率中,不牺牲正常的变压器预期寿命或供电可靠性,以达到最佳利用变压器容量的目的。通过提议的增加装船限额,将为安大略省水电公司节省大量成本,在三年内估计可节省4,500,000加元(NPV 1991加元)(DS资本成本每年减少10,000,000加元)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号