首页> 外文期刊>Engineering news-record >A Measurable Plan Can Improve Labor
【24h】

A Measurable Plan Can Improve Labor

机译:可衡量的计划可以改善劳动力

获取原文
获取原文并翻译 | 示例
           

摘要

We continue to hear concerns about the shortage of skilled craft workers. The problem is not new nor is it unique to the U.S. To me, the causes and obvious solutions are illustrated in the following diagram. Individual companies, national organizations and many labor unions have tried various recruiting efforts. Even with increased recruiting, retention remains a problem. Demographic studies show a major exodus of skilled craft workers after they reach their mid-30s.
机译:我们继续听到对熟练技工短缺的担忧。这个问题不是新问题,也不是美国独有的问题。下图说明了原因和明显的解决方案。各个公司,国家组织和许多工会都尝试了各种招聘工作。即使增加招募,保留仍然是一个问题。人口统计学研究显示,熟练的技工达到30多岁后便大量外流。

著录项

  • 来源
    《Engineering news-record》 |2003年第9期|p.47|共1页
  • 作者

    Richard Tucker;

  • 作者单位

    Center for Construction Industry Studies at The University of Texas at Austin;

  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号