首页> 外文期刊>Engineering news-record >Design Issues Force Repairs To Big Alaska Air Base Hangars
【24h】

Design Issues Force Repairs To Big Alaska Air Base Hangars

机译:设计问题对大阿拉斯加空军基地机库进行强制维修

获取原文
获取原文并翻译 | 示例
           

摘要

Software problems appear to be at the core of design errors that have forced delays in construction of two huge hangars that are to house the U.S. Air Force's new C-17 transport aircraft at Elmendorf Air Force Base, near Anchorage. But facility engineer CH2M Hill Cos. says it will cover design-related repair costs. The design flaw was found last fall during steel erection for one hangar, a $29.2-million, 60,000-sq-ft facility with trusses reaching 210 ft long. The first of eight aircraft arrived at the base last June.
机译:软件问题似乎是设计错误的核心,这迫使两个大型机库的建造被迫推迟,这两个机库要在安克雷奇附近的埃尔曼多夫空军基地容纳美国空军的新型C-17运输机。但是设施工程师CH2M Hill Cos。说,它将支付与设计有关的维修费用。该设计缺陷是在去年秋天为一个机库进行钢架安装时发现的,该机库耗资2920万美元,占地60,000平方英尺,桁架长210英尺。八月份,八架飞机中的第一架抵达基地。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号