首页> 外文期刊>Engineering news-record >Seismic Upgrade First
【24h】

Seismic Upgrade First

机译:地震升级优先

获取原文
获取原文并翻译 | 示例
           

摘要

Needing to expand its library, San Francisco State University (SFSLJ) first had to have a seismic upgrade of the existing six concrete levels of the J. Paul Leonard Library and the Sutro Library before the addition of five floors of new concrete. Unbuildable for years due to budget and constructability issues, in 2008 SFSU turned to Barnhart Balfour Beatty to execute a design-build delivery. One of the largest unknowns on the project was the ability to resist seismic events to the structure, which received additions in phases over three decades since its original construction 55 years ago.
机译:为了扩展图书馆,旧金山州立大学(SFSLJ)首先必须对J. Paul Leonard图书馆和Sutro图书馆的现有六个混凝土层进行抗震升级,然后再添加五层新混凝土。由于预算和可施工性问题而无法建造多年,SFSU于2008年求助于Barnhart Balfour Beatty进行设计建造交付。该项目最大的未知数之一是抵抗结构地震的能力,自55年前的原始构造以来,该结构在过去的三十年中分阶段得到了补充。

著录项

  • 来源
    《Engineering news-record》 |2010年第12期|p.C16-C17|共2页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号