Construction began on Olmsted Locks and Dam in 1996 and continues today. Locks and dams Nos. 52 and 53 will be replaced with this single facility at mile 964.4 of the Ohio River in Ohio. The Olmsted project involves underwater foundation preparation, lift-in constructionof the tainter gates and navigable pass shells for the dam, floating approach walls, directly connected hydraulic cylinder operation of the culvert valves, miter gates, tainter gates and a central station to operate both the dam and the twin locks. The project currently is scheduled for a 2021 completion, depending upon funding. This project is unique in the fact that it's the first precast spillway the Army Corps of Engineers has constructed. The project has entered its final phase of constructing the dam extending across the Ohio River.
机译:1996年开始在Olmsted Locks and Dam建设,直至今天。位于俄亥俄州俄亥俄河964.4英里处的52号和53号闸门和水坝将被这一单一设施所取代。奥尔姆斯特德(Olmsted)项目涉及水下基础准备,大坝闸门和水坝通航壳体的提升结构,浮式进水墙,涵洞阀的直接连接液压缸操作,斜接闸门,污闸门和中央站,以同时操作两个大坝和双锁。该项目目前计划在2021年完成,具体取决于资金。该项目的独特之处在于它是陆军工程兵团建造的第一条预制溢洪道。该项目已进入建设横跨俄亥俄河的大坝的最后阶段。

著录项

  • 来源
    《Engineering news-record》 |2010年第12期|p.C9|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号