首页> 外文期刊>Engineering news-record >Interview With Ken Simonson, Chief Economist, The Associated General Contractors of America
【24h】

Interview With Ken Simonson, Chief Economist, The Associated General Contractors of America

机译:美国联合总承包商公司首席经济学家肯·西蒙森的访谈

获取原文
获取原文并翻译 | 示例
           

摘要

Q: How can the stimulus 2010 money get distributed faster?rnA: The American Recovery and Reinvestment Act of 2009, abbreviated as ARRA and commonly referred to as the stimulus, has been a mixed success. State DOTs generally made quick use of their allocations and succeeded in obligating all funds ahead of the March 2 deadline. Many highway contractors say that stimulus money has enabled them to avoid layoffs and/or add employees who would not otherwise have been on the payroll now.
机译:问:2010年刺激资金如何更快地分配?rnA:2009年《美国复苏与再投资法案》(简称ARRA,通常被称为刺激法案)取得了喜忧参半的结果。州DOT通常会快速使用其拨款,并在3月2日截止日期前成功清偿了所有资金。许多公路承包商说,刺激资金使他们避免了裁员和/或增加了原本不会出现在工资单上的员工。

著录项

  • 来源
    《Engineering news-record》 |2010年第12期|p.C5|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号