首页> 外文期刊>Engineering news-record >Boat-Lift Bulkhead Gets Design-Build Solution to Save Time and Money
【24h】

Boat-Lift Bulkhead Gets Design-Build Solution to Save Time and Money

机译:Boat-Lift舱壁获得设计建造解决方案,以节省时间和金钱

获取原文
获取原文并翻译 | 示例
           

摘要

The Caven Point Marine Terminal in Jersey City, N.J., was severely impacted by Superstorm Sandy in 2012. It's home to the United States Army Corp of Engineers (USACE) working fleet and serves as the base for rescue missions on the eastern seaboard. The USACE chose Simpson & Brown Marine Construction to complete a boat-lift bulkhead that needed to be able to provide vertical support for the lift hoists while resisting horizontal soil and crane loads, without tiebacks.
机译:新泽西州泽西市的Caven Point航站楼在2012年受到超级风暴桑迪的严重影响。它是美国陆军工程兵团(USACE)工作舰队的所在地,是东部沿海地区执行救援任务的基地。 USACE选择了Simpson&Brown Marine Construction来完成船用起重舱壁,该舱壁需要能够为起重葫芦提供垂直支撑,同时能够抵抗水平的土壤和起重机负载,而不会造成束缚。

著录项

  • 来源
    《Engineering news-record》 |2019年第3期|46-46|共1页
  • 作者

    Eda Galeno;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号