Supporting Maintenance At the Grand Coulee Dam

机译:大库里大坝的维护支持

获取原文
获取原文并翻译 | 示例
           

摘要

Originally built in the 1930s, the Grand Coulee Dam in Washington State has been undergoing a series of maintenance projects to ensure that it will continue to produce safe and reliable power into the future. One stage of the project required the heating of a 40-ft wide, 7-ft-tall outer head cover of the turbine shaft to a specific core temperature. In order to achieve this temperature, the engineers applied induction heating to one side of the workpiece. Only when the opposite side of the workpiece reached target temperature could the maintenance engineers be certain that the required core temperature had been achieved. The team from Red-D-Arc provided induction heating systems and assistance with training and setup during this essential part of the maintenance process.
机译:华盛顿州的库里大水坝最初建于1930年代,一直在进行一系列维护项目,以确保其在未来继续生产安全可靠的电力。该项目的一个阶段需要将涡轮轴的40英尺高,7英尺高的外盖加热到特定的核心温度。为了达到这个温度,工程师将感应加热应用于工件的一侧。只有当工件的另一侧达到目标温度时,维护工程师才能确定达到了所需的核心温度。 Red-D-Arc的团队在维护过程的这一重要部分中提供了感应加热系统以及培训和设置方面的帮助。

著录项

  • 来源
    《Engineering news-record》 |2019年第14期|46-46|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号