首页> 外文期刊>Engineering in Miniature >Now It's Finished A Review of the Construction of USRA 2-8-2 Mikado No 1942 'Screaming Eagle'
【24h】

Now It's Finished A Review of the Construction of USRA 2-8-2 Mikado No 1942 'Screaming Eagle'

机译:现在完成了USRA 2-8-2天皇1942号“尖叫之鹰”的建造工作

获取原文
获取原文并翻译 | 示例
           

摘要

My thoughts first turned to making my own scratch build locomotive around 2007, whist I was well on the way to finishing my Model Works A3 Dick Turpin. Some ideas were being formed based on a few things I had picked up from listening to friends in the club and the experience of driving many different types of miniature locomotives. After some thought, I was convinced that a number of basic ideas had became important to me. These had evolved over a few years since I became part of this wonderful hobby of miniature railways and model engineering. These were: Only 2 cylinders- on the outside, everything must be within easy access for maintenance, powerful (as I love passenger hauling), superheated and to use metric measurements and fasteners whereever practical, (especially cap screws where they are unseen).
机译:我的想法最初是在2007年左右制作我自己的从零开始的机车,当时我在完成Model Works A3 Dick Turpin的道路上进展顺利。根据我从听俱乐部的朋友那里得到的几件事以及驾驶许多不同类型的微型机车的经验,形成了一些想法。经过一番思考,我确信许多基本思想对我来说变得很重要。自从我成为微型铁路和模型工程这一奇妙爱好的一部分以来,这些方法已经发展了几年。它们是:仅2个气瓶-在外面,所有东西都必须放在易于维修的地方,并且要有力(如我所喜欢的乘客拖运),过热并且在可行的地方使用公制尺寸和紧固件(尤其是看不见的有头螺钉)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号