首页> 外文期刊>Engineering, Construction and Architectural Management >Risk paths in BUM adoption: empirical study of China
【24h】

Risk paths in BUM adoption: empirical study of China

机译:采用BUM的风险路径:中国的实证研究

获取原文
获取原文并翻译 | 示例
           

摘要

Purpose - The purpose of this paper is to model the paths of risks associated with building information modeling (BIM) adoption in the Chinese architecture, engineering and construction industry. Design/methodology/approach - A total of 16 risks were identified from the literature review and grouped into nine categories. The data were collected through a questionnaire survey with 95 professionals in China; The partial least square structural equation modeling was used to analyze the data. Findings - The results suggested the risk categorization was confirmed, and that 15 hypothetical risk paths were statistically significant, which formed 13 chains of risk paths. "Inadequate relevant knowledge and expertise" was the primary root risk category of all the 13 chains of risk paths. Additionally, "technological issues," "poor information sharing and collaboration," and "liability for data input" had direct effect on the "cost overrun with BIM," while all the other risks indirectly influence cost via these three risk categories. Research limitations/implications - Most of the respondents were designers because few clients and contractors have adopted BIM. In addition, the impact and likelihood of risks were accessed by respondents' judgment based on their experience, which is a common problem of risk management research. As this study focuses on the Chinese architecture, engineering and construction industry, there would be geographical limitation on the findings. Practical implications - This study provides practitioners with a clear understanding of the risks associated with BIM adoption and enables practitioners to take measures to mitigate the root risks and assure the potential benefits of BIM. Originality/value - Although there have been studies on the risks associated with BFM adoption, most of them lacked empirical evidence and failed to examine the interactions between risks. This study is different from these prior studies, because it focuses on the interrelationships between risks and identifies the risk paths and root risks using the empirical data, Therefore, this study expands the literature relating to both BIM and risk management. Also, this study enables practitioners to take measures to mitigate the root risks and assure the potential benefits produced by BIM, thereby contributing to the practice.
机译:目的-本文的目的是为与中国建筑,工程和建筑行业中采用建筑信息模型(BIM)相关的风险路径建模。设计/方法/方法-从文献综述中总共识别出16种风险,并分为9类。这些数据是通过对中国95位专业人员进行的问卷调查收集的;使用偏最小二乘结构方程建模来分析数据。调查结果-结果表明风险分类已得到确认,并且15条假设的风险路径具有统计学意义,形成了13条风险路径链。 “相关知识和专业知识不足”是所有13条风险路径链的主要根本风险类别。此外,“技术问题”,“信息共享和协作不良”和“数据输入责任”直接影响了“ BIM造成的成本超支”,而所有其他风险都间接影响成本通过这三个风险类别。研究的局限性/意义-大多数受访者是设计师,因为很少有客户和承包商采用BIM。另外,风险的影响和可能性是根据受访者的经验来判断的,这是风险管理研究中的常见问题。由于这项研究的重点是中国的建筑,工程和建筑行业,因此研究结果将受到地域限制。实际意义-这项研究使从业者对采用BIM带来的风险有了清晰的了解,并使从业者能够采取措施减轻根本风险并确保BIM的潜在利益。原创性/价值-尽管已经对采用BFM带来的风险进行了研究,但其中大多数缺乏经验证据,未能检验风险之间的相互作用。这项研究与这些先前的研究不同,因为它侧重于风险之间的相互关系,并使用经验数据确定风险路径和根本风险,因此,本研究扩大了与BIM和风险管理相关的文献。此外,这项研究使从业人员能够采取措施减轻根本风险,并确保BIM产生潜在的利益,从而为实践提供帮助。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号