...
首页> 外文期刊>Engineering Computations >Analysis of the field monitoring data on soil movements and adjacent building settlement due to shield tunnelling
【24h】

Analysis of the field monitoring data on soil movements and adjacent building settlement due to shield tunnelling

机译:盾构施工引起的土壤运动及邻近建筑物沉降现场监测数据分析

获取原文
获取原文并翻译 | 示例
           

摘要

Purpose The shield tunnels closely constructed near the foundations have an inevitable influence on the structures, even results in the large settlement or uplift of the structures. Design/methodology/approach The comparison of structural deformation of three different foundations is presented based on the field monitoring data. Findings Shield tunnelling parameters vary for the different types of foundations. For the long pile foundations, the recommended speed is 3 to 4 cm/min, the grouting pressure is about 0.3 MPa and the grouting rate ranges from 150 to 180. Originality/value The study based on the field monitoring data is rarely reported, especially the topic about the structural deformation of different types of the foundations.
机译:目的在基础附近紧密构造的盾构隧道对结构产生不可避免的影响,甚至导致结构的大沉降或隆起。设计/方法/方法基于现场监测数据,比较了三种不同基础的结构变形。结论对于不同类型的地基,盾构隧道参数会有所不同。对于长桩基础,推荐速度为3至4 cm / min,注浆压力约为0.3 MPa,注浆速率范围为150至180。原创性/价值基于现场监测数据的研究很少报道,尤其是有关不同类型基础的结构变形的主题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号