首页> 外文期刊>Engineering Applications of Artificial Intelligence >Project scheduling under uncertainty using fuzzy modelling and solving techniques
【24h】

Project scheduling under uncertainty using fuzzy modelling and solving techniques

机译:使用模糊建模和求解技术的不确定性下的项目调度

获取原文
获取原文并翻译 | 示例
           

摘要

In the real world, projects are subject to numerous uncertainties at different levels of planning. Fuzzy project scheduling is one of the approaches that deal with uncertainties in project scheduling problem. In this paper, we provide a new technique that keeps uncertainty at all steps of the modelling and solving procedure by considering a fuzzy modelling of the workload inspired from the fuzzy/ possibilistic approach. Based on this modelling, two project scheduling techniques. Resource Constrained Scheduling and Resource Leveling, are considered and generalized to handle fuzzy parameters. We refer to these problems as the Fuzzy Resource Constrained Project Scheduling Problem (FRCPSP) and the Fuzzy Resource Leveling Problem (FRLP). A Greedy Algorithm and a Genetic Algorithm are provided to solve FRCPSP and FRLP respectively, and are applied to civil helicopter maintenance within the framework of a French industrial project called Helimaintenance.
机译:在现实世界中,项目在不同级别的计划中会遇到许多不确定性。模糊项目调度是解决项目调度问题不确定性的方法之一。在本文中,我们提供了一种新技术,通过考虑从模糊/可能方法启发而来的工作负载的模糊建模,可以在建模和求解过程的所有步骤中保持不确定性。基于此建模,两种项目调度技术。考虑并限制了资源受限调度和资源均衡,以处理模糊参数。我们将这些问题称为模糊资源受限项目计划问题(FRCPSP)和模糊资源均衡问题(FRLP)。分别提供了贪婪算法和遗传算法来求解FRCPSP和FRLP,并在法国Helimaintenance工业项目的框架内将其应用于民用直升机维修。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号