The effect of contract methods on the lead time of a two-level photovoltaic supply chain: revenue-sharing vs. cost-sharing

机译:合同方法对两级光伏供应链的提前期的影响:收入共享与成本分享

获取原文
获取原文并翻译 | 示例
           

摘要

In the photovoltaic industry, a large number of photovoltaic power plants are not delivered according to construction schedules, resulting in considerable impacts on various stakeholders. Lead time has been identified as one of the key issues that urgently needs to be resolved. In this paper, we study a two-level photovoltaic supply chain consisting of the customer, the assembler, and the module manufacturer. The basic model, revenue-sharing model, and cost-sharing model are established to analyze the lead time of the module manufacturer and the assembler considering the decline of government subsidies. The results indicate that the cost-sharing contract can effectively control the lead time of the module manufacturer, but the revenue-sharing contract cannot exert this control. Furthermore, if the government subsidy drops from 0.0553 USD/kWh to 0.01195 USD/kWh, the production capacity will be reduced by approximately 37% due to the reduction in installed capacity, and the lead time will decrease by about 27%. For the module manufacturer, when the non-production capacity costs drop by 20%, the profit increases by about 58%. However, when the production capacity costs are reduced by 20%, the profit increases by only about 6%. (c) 2021 Elsevier Ltd. All rights reserved.
机译:在光伏产业中,大量的光伏发电厂不会根据施工时间表提供,导致各种利益相关者产生了相当大的影响。提前期已被确定为迫切需要解决的关键问题之一。在本文中,我们研究了由客户,汇编器和模块制造商组成的两级光伏供应链。建立基本模型,收入共享模型和成本共享模型,以分析模块制造商和汇编器的提前期,考虑到政府补贴的衰落。结果表明,成本共享合同可以有效地控制模块制造商的提前期,但收入共享合同不能施加这种控制。此外,如果政府补贴从0.0553美元/千瓦时跌至0.01195美元/千瓦时,由于装机容量的减少,生产能力将减少约37%,提前期将减少约27%。对于模块制造商,当非生产能力成本下降20%时,利润增加约58%。但是,当生产能力成本降低20%时,利润仅增加6%。 (c)2021 elestvier有限公司保留所有权利。

著录项

  • 来源
    《Energy》 |2021年第15期|120930.1-120930.12|共12页
  • 作者

    Zhao Jing; Zhang Qin;

  • 作者单位

    Nanjing Univ Aeronaut & Astronaut Coll Econ & Management Nanjing 210016 Peoples R China|Nanjing Univ Aeronaut & Astronaut Res Ctr Soft Energy Sci Nanjing 210016 Peoples R China;

    Nanjing Univ Aeronaut & Astronaut Coll Econ & Management Nanjing 210016 Peoples R China|Nanjing Univ Aeronaut & Astronaut Res Ctr Soft Energy Sci Nanjing 210016 Peoples R China;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Photovoltaic industry; Lead time; Supply chain; Revenue-sharing; Cost-sharing;

    机译:光伏产业;交付时间;供应链;收入共享;成本分享;