首页> 外文期刊>Energy >Risk assessment of offshore wave-wind-solar-compressed air energy storage power plant through fuzzy comprehensive evaluation model
【24h】

Risk assessment of offshore wave-wind-solar-compressed air energy storage power plant through fuzzy comprehensive evaluation model

机译:通过模糊综合评价模型对海上波浪风 - 太阳能压缩空气储能电厂的风险评估

获取原文
获取原文并翻译 | 示例
           

摘要

As a promising offshore multi-energy complementary system, wave-wind-solar-compressed air energy storage (WW-S-CAES) can not only solve the shortcomings of traditional offshore wind power, but also play a vital role in the complementary of different renewable energy sources to promote energy sustainable development in coastal area. However, as a new type of energy conversion system, the construction and operation risks of WW-S-CAES project faced by project managers are variable, complex and long term, which requires synthetic assessment and target responses. To evaluate WW-S-CAES project risk along low carbon development in this paper, 14 critical criteria in management, economy and environment are firstly identified. Then, a target risk assessment framework is established through hesitant fuzzy linguistic term sets improved triangular fuzzy number and fuzzy comprehensive evaluation method. Result indicates that the risk level of offshore WW-S-CAES is closer to middle high, and the management risk and economy risk occupy the determinant position. Based on this, targeted risk response strategies are proposed for decision makers to realize reasonable allocation of resources and appropriate risk aversion. Furthermore, since the risk analysis of offshore WW-S-CAES power plant has not been paid enough attention, this paper expands the knowledge and contributes to the literature. ? 2021 Elsevier Ltd. All rights reserved.
机译:作为一个有前途的海上多能量互补系统,波浪风 - 太阳能 - 压缩空气储能(WW-S-CAES)不仅可以解决传统的海上风力力量的缺点,而且在不同的互补内发挥着重要作用可再生能源促进沿海地区的能源可持续发展。然而,作为一种新型的能量转换系统,项目经理面临的WW-S-CAES项目的建设和运营风险是可变的,复杂和长期,这需要合成评估和目标反应。为了评估WW-S-CAES沿着低碳发展的项目风险,首先确定了14个管理,经济和环境的关键标准。然后,通过犹豫模糊语言术语设定改进的三角模糊数和模糊综合评价方法来建立目标风险评估框架。结果表明,海上WW-S-CAE的风险水平更接近中高,管理风险和经济风险占据了决定性地位。基于这一点,提出了针对决策者实现合理分配资源和适当的风险厌恶的有针对性的风险反应战略。此外,由于海上WW-S-CAES发电厂的风险分析尚未得到足够的报酬,因此本文扩大了知识并为文献提供了贡献。还是2021 elestvier有限公司保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号