首页> 外文期刊>Energy sources >An Economic Model for the Revamping of a Pulverized Coal-fired Boiler
【24h】

An Economic Model for the Revamping of a Pulverized Coal-fired Boiler

机译:煤粉锅炉改造的经济模型

获取原文
获取原文并翻译 | 示例
           

摘要

Equipping existing thermal power plants (TPPs) with newer technologies, such as fluidized bed combustion (FBC), is vital for many countries due to concerns about the economy, the environment, and energy policy. First, this study presents a general model for economic analysis of the revamping of a pulverized coal-fired boiler with FBC. Second, the developed model is applied to a 140 MW pulverized coal-fired TPP. Third, the payback period (PBP) is calculated by using the net present value (NPV) method. Finally, the effects of almost all technical and economic parameters, such as power loss, electricity price, and escalation rate are investigated on PBP and NPV. As a result, the outcomes of this study show that power loss has a significant effect on PBP and NPV.
机译:由于对经济,环境和能源政策的担忧,为现有的火力发电厂(TPP)配备流化床燃烧(FBC)等较新的技术对于许多国家而言至关重要。首先,本研究提出了一种用FBC改造粉煤锅炉的经济分析的通用模型。其次,将开发的模型应用于140兆瓦的粉煤TPP。第三,使用净现值(NPV)方法计算投资回收期(PBP)。最后,研究了PBP和NPV上几乎所有技术和经济参数的影响,例如功率损耗,电价和升级率。结果,这项研究的结果表明,功率损耗对PBP和NPV有显着影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号