首页> 外文期刊>Energy and Buildings >Study on intermittent operation strategies of a hybrid ground-source heat pump system with double-cooling towers for hotel buildings
【24h】

Study on intermittent operation strategies of a hybrid ground-source heat pump system with double-cooling towers for hotel buildings

机译:旅馆建筑双冷却塔混合地源热泵系统间歇运行策略研究

获取原文
获取原文并翻译 | 示例
           

摘要

This study proposes intermittent operation strategies of a hybrid ground-source heat pump (HGSHP) system with double-cooling towers. The program aims at solving the problem of soil heat accumulation and optimizing the heat pump systems, that is, operating efficiently while reducing operating costs. The annual dynamic load of a hotel in Wuhan was calculated by Designer's Simulation Toolkit (DeST) software, and a GSHP system of the hotel was designed. The HGSHP model was constructed by TRNSYS. On the basis of hotel load patterns, four operating conditions were designed for this system including one continuous condition and three intermittent conditions conducted 20 years simulation. Several performance parameters of the HGSHP under four operating conditions were studied. These parameters included the following: average soil temperature, energy consumption, electricity fees reduction and investment payback period. Simulation results indicated that the proposed intermittent operation strategies evidently alleviated soil heat accumulation. The optimal intermittent operating condition that favors both energy consumption reduction and soil temperature recovery was found. For hotel buildings in cooling-dominated areas, the third intermittent operating condition was the optimal one among the three conditions, with an investment payback period of three years.
机译:这项研究提出了带有双冷却塔的混合地源热泵(HGSHP)系统的间歇运行策略。该计划旨在解决土壤热量积聚的问题并优化热泵系统,即在降低运营成本的同时高效运营。利用Designer的仿真工具包(DeST)软件计算了武汉某酒店的年动态负荷,并设计了该酒店的GSHP系统。 HGSHP模型是由TRNSYS构建的。根据酒店的负荷模式,为该系统设计了四种运行条件,包括一个连续条件和三个间歇条件,进行了20年的模拟。研究了HGSHP在四个运行条件下的几个性能参数。这些参数包括:平均土壤温度,能耗,降低的电费和投资回收期。仿真结果表明,所提出的间歇运行策略明显减轻了土壤热量的积累。找到了有利于降低能耗和恢复土壤温度的最佳间歇运行条件。对于制冷为主的地区的酒店建筑物,第三种间歇运行条件是这三种条件中的最佳条件之一,投资回收期为三年。

著录项

  • 来源
    《Energy and Buildings》 |2014年第6期|506-512|共7页
  • 作者单位

    The College of Environment Science and Engineering, Huazhong University of Science and Technology, Wuhan, China;

    School of Environmental Science and Engineering, Huazhong University of Science and Technology, Wuhan 430074, China;

    The College of Environment Science and Engineering, Huazhong University of Science and Technology, Wuhan, China;

    The College of Environment Science and Engineering, Huazhong University of Science and Technology, Wuhan, China;

    The College of Environment Science and Engineering, Huazhong University of Science and Technology, Wuhan, China;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Double-cooling towers; Hybrid ground-source heat pump (HGSHP); Intermittent operation; Soil heat accumulation; Ground heat exchanger (GHE);

    机译:双冷却塔;混合地源热泵(HGSHP);间歇运行;土壤热量积聚;地面热交换器(GHE);

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号