...
首页> 外文期刊>Electrical India >Threat of mounting financial losses in Electricity Distribution on Indian economy and way forward
【24h】

Threat of mounting financial losses in Electricity Distribution on Indian economy and way forward

机译:电力分配中不断增加的金融损失对印度经济的威胁及未来的发展方向

获取原文
获取原文并翻译 | 示例
           

摘要

The Electricity Act, 2003 envisaged a new era in the power sector with unshackling of the sector from government controls, establishment of independent regulatory institutions, delicensing of thermal generation and establishment of unbundled power generating, transmission and distribution companies operating on commercial principles for making available good quality power to all. Competition was to be the cornerstone for bringing in operational efficiency and it was considered that competition will determine the price rather than any cost plus exercise on the basis of operating norms and parameters. But this was a dream too Utopian to come true.
机译:2003年的《电力法》设想了电力行业的新纪元,该行业将从政府控制中解脱出来,建立独立的监管机构,对热力发电进行许可,并建立以商业原则运作的非捆绑式发电,输电和配电公司优质的力量给所有人。竞争是提高运营效率的基石,据认为,竞争将决定价格,而不是根据运营规范和参数决定任何成本加成本。但这是一个乌托邦式的梦想,无法实现。

著录项

  • 来源
    《Electrical India》 |2011年第11期|p.166-168170|共4页
  • 作者

    Gurudeo Sinha;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号