...
首页> 外文期刊>Electrical Engineering >Upgrade for Supernova tester
【24h】

Upgrade for Supernova tester

机译:升级超新星测试仪

获取原文
获取原文并翻译 | 示例
           

摘要

The Seaward Group has upgraded the range of test functions performed by its Supernova dual voltage PAT tester to incorporate the testing of RCD trip times alongside its existing flash/hi-pot test and dual voltage testing capabilities. This means that all electrical safety tests can now be carried out on the complete range of workplace electrical equipment and appliances. The inclusion of the RCD test is in keeping with the latest IEE Code that when extension leads or multi-way adaptors are fitted with an RCD, the operation of the RCD should be checked using a test instrument to determine that the trip time is within specified limits.
机译:Seaward Group已升级了其Supernova双电压PAT测试仪执行的测试功能范围,将RCD跳闸时间的测试与现有的闪速/高压测试和双电压测试功能相结合。这意味着现在可以在整个工作场所的电气设备和器具上执行所有电气安全测试。 RCD测试的内容与最新的IEE规范保持一致,即当扩展导线或多路适配器装有RCD时,应使用测试仪器检查RCD的运行,以确定跳闸时间在规定范围内限制。

著录项

  • 来源
    《Electrical Engineering》 |2011年第decaajana期|p.16|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号