...
首页> 外文期刊>Electric power systems research >Asynchronous parallel stochastic dual dynamic programming applied to hydrothermal generation planning
【24h】

Asynchronous parallel stochastic dual dynamic programming applied to hydrothermal generation planning

机译:异步并行随机双动脉编程应用于水热生成规划

获取原文
获取原文并翻译 | 示例
           

摘要

Optimizing power generation planning is very important to achieve the lowest possible costs while meeting the required power demand along time. High computational resources are required to solve this problem and, in some cases, the use of parallel schemes is imperative. A widely used method to solve long-term energy planning problems is an extension of Dual Dynamic Programming (DDP) called Stochastic Dual Dynamic Programming (SDDP) which makes use of sampling techniques to be able to deal with high-dimensional state-spaces. In this work, we propose an asynchronous SDDP parallel scheme (labeled ASDDP) capable of overcoming the intrinsic synchronism of traditional versions of the SDDP method, by dividing subproblems by time steps instead of forward samples. This parallelization strategy, which includes a variant called totally asynchronous ASDDP (TASDDP), allows us to better exploit the parallel resources and decreases the overall CPU time to solve the problem. Consistency and performance tests were applied to evaluate the application of the proposed ASDDP and TASDDP algorithms in the real Brazilian system.
机译:优化发电规划对于实现最低可能的成本非常重要,同时满足所需的电力需求。需要高计算资源来解决这个问题,并且在某些情况下,使用并行方案是必要的。求解长期能量规划问题的广泛使用方法是双动态编程(DDP)的扩展,称为随机双动态编程(SDDP),其利用采样技术能够处理高维状态空间。在这项工作中,我们提出了一种异步SDDP并行方案(标记为ASDDP),其能够克服SDDP方法的传统版本的内在同步,通过时间步骤而不是转发样本来划分子问题。这种并行化策略包括称为完全异步ASDDP(TASDDP)的变体,允许我们更好地利用并行资源并降低整体CPU时间来解决问题。应用一致性和性能测试来评估所提出的ASDDP和TASDDP算法在真正的巴西系统中的应用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号