...
首页> 外文期刊>Dredging & port construction >Tuas Phase 1 construction under way
【24h】

Tuas Phase 1 construction under way

机译:大士一期工程正在进行中

获取原文
获取原文并翻译 | 示例
           

摘要

Stringent environmental conditions are in place as the Singapore Maritime and Port Authority (MPA) begins an ambitious six-year project to build a 20-berth container terminal with an annual capacity of 20 million teu. MPA awarded the Phase 1 contract, worth USD1.8 billion, to a joint venture between DEME subsidiary Dredging International Asia Pacific and South Korean group Daelim Industrial. The scope of work includes building an 8.6 km quay wall, dredging the fairway and basins, and reclaiming 294 ha of new land using 80 million m~3 of material. MPA has laid down strict environmental requirements for all construction activities, which will be monitored and supervised by an independent environmental specialist.
机译:随着新加坡海事和港口管理局(MPA)开始一项雄心勃勃的为期六年的项目,以建设一个20泊位的集装箱码头,年产能为2000万标准箱,严苛的环境条件已经到位。 MPA向DEME子公司Dredging International Asia Pacific与韩国集团Daelim Industrial的合资企业授予了第一阶段合同,价值18亿美元。工作范围包括修建8.6公里的码头围墙,疏通球道和盆地,并使用8000万立方米的材料回收294公顷的新土地。 MPA对所有建筑活动都制定了严格的环境要求,并将由独立的环境专家进行监控。

著录项

  • 来源
    《Dredging & port construction》 |2015年第7期|8-8|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号