首页> 外文期刊>Urban, Planning and Transport Research >Comparing travel time performance-based measures to assess the effect of a freeway road construction project on freeway and connecting arterial street links
【24h】

Comparing travel time performance-based measures to assess the effect of a freeway road construction project on freeway and connecting arterial street links

机译:比较旅行时间绩效的措施,评估高速公路道路建设项目对高速公路和连通动脉街环节的影响

获取原文
           

摘要

A road construction project has a significant effect on traffic congestion and operational performance of the project corridor and connecting street links. However, not many researchers focused on travel time performance-based measures to assess the effect of a road construction project on the project corridor and connecting street links. Therefore, travel time data for a freeway road resurfacing project on 100 links within its vicinity were gathered and processed to assess the effect on freeway and connecting arterial street links. A paired t-test was used to examine the differences in means between the before and during road resurfacing project period travel time performance-based measures. There is a significant difference in travel time performance-based measures before and during the road resurfacing project period on freeway links and connecting arterial links. Their significance varied by the time-of-the-day and day-of-the-week on the freeway and connecting arterial links. The average travel time, planning time, and travel time index can consistently explain the effect of a road resurfacing (construction) project on transportation system performance when compared to buffer time and buffer time index. The findings can be used to enhance temporary traffic control practices in the vicinity of road construction projects.
机译:道路建设项目对项目走廊的交通拥堵和运营表现有重大影响,并连接街头链接。然而,没有许多研究人员专注于旅行时间绩效的措施,以评估道路建设项目对项目走廊和连接街头链接的影响。因此,收集和加工在其附近的100个环路中的高速公路道路重新铺设项目的旅行时间数据,以评估高速公路和连接动脉街环路的影响。配对T检验用于检查基于路径级行驶时间绩效措施之前和道路之间的手段之间的差异。在高速公路链路和连接动脉链路的道路重新铺设工程期之前和期间,旅行时间绩效的措施存在显着差异。他们在高速公路上的日期和一天的一天内变化的重要性和连接动脉链路。与缓冲时间和缓冲时间指数相比,平均旅行时间,规划时间和旅行时间指数可以一致地解释道路Resurfacing(建筑)项目对运输系统性能的影响。该研究结果可用于增强道路建设项目附近的临时交通管制实践。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号