首页> 外文期刊>Underground Space >Deformation analysis and safety assessment of existing metro tunnels affected by excavation of a foundation pit
【24h】

Deformation analysis and safety assessment of existing metro tunnels affected by excavation of a foundation pit

机译:基础坑挖掘影响现有地铁隧道的变形分析与安全评估

获取原文
           

摘要

The excavation of a foundation pit considerably affects the adjacent structures and underground pipelines owing to the change in the stress state of the surrounding soil, resulting in deformation. The study of an actual engineering case was conducted to examine the influence of excavation on the deformation of adjacent subway tunnels. The finite element analysis software PLAXIS 3D was used to simulate the entire excavation process. The structural design of the foundation pit was optimized based on the simulation results to ensure the stability of the foundation pit and the safety of the existing subway tunnel structure. Finally, the safety evaluation of the excavation of the foundation pit that caused the deformation of the adjacent subway tunnel was performed. The influence of the excavation and unloading of the foundation pit on the subway tunnel is closely related to the distance between the subway and the foundation pit, the amount of earthwork excavated at one time, and the engineering geological conditions. The results of this paper can provide useful reference for the design optimization and safety assessment of similar projects.
机译:由于周围土壤的应力状态的变化,基础坑的挖掘显着影响了相邻的结构和地下管道,导致变形。进行了实际工程案例的研究,以研究挖掘对邻近地铁隧道变形的影响。有限元分析软件PLAXIS 3D用于模拟整个挖掘过程。基于模拟结果优化了基坑的结构设计,以确保基坑稳定性和现有地铁隧道结构的安全性。最后,进行了引起相邻地铁隧道变形的基坑的挖掘的安全评价。挖掘机挖掘机坑对地铁隧道的影响与地铁和基坑之间的距离密切相关,一次挖掘的土方工程量,以及工程地质条件。本文的结果可以为类似项目的设计优化和安全评估提供有用的参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号