Perfect order fulfillment in construction supply chain performance

机译:建筑供应链表现完善的订单履行

获取原文
           

摘要

The problem of construction supply chains is the fragmentation of unsustainable projects such as manufacturing. Therefore it is necessary to have supply chain performance indicator standards related to the procurement of materials that can be used as a reference for the performance of a project or contractor. The purpose of this study is to measure the performance of the construction supply chain with the perfect order fulfillment (POF) indicator adopted from the Supply Chain Operations Reference (SCOR) 12.0. The adoption stage starts from the definition in construction to the calculation of indicators in the project. The results showed that suppliers of steel and ready mix concrete at close range from the project had better performance. In the case study, the perfect order fulfillment performance of steel suppliers with a distance of 345 km is worth 89.476% while suppliers with a distance of 540 km are worth 87.535%. The supplier of ready mix concrete within 7.3 km is worth 95.355% and the supplier with a distance of 15.7 km is 91.705%.
机译:建筑供应链的问题是制造业等不可持续项目的碎片。因此,有必要提供与可作为项目或承包商表现参考的材料采购相关的供应链绩效指标标准。本研究的目的是测量建筑供应链的性能与供应链操作参考(SCOR)12.0采用的完美订单履行(POF)指标。采用阶段从建设的定义开始计算项目中指标的计算。结果表明,该项目近距离钢材和准备混合混凝土的供应商具有更好的性能。在案例研究中,钢供应商的完美订单履行性能为345公里的价值89.476%,而距离540公里的供应商价值87.535%。 7.3公里内的准备混合混凝土供应商价值95.355%,供应商距离为15.7公里,为91.705%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号