首页> 外文期刊>E3S Web of Conferences >Effect of Building Information Modeling (BIM) on reduced construction time-costs: a case study
【24h】

Effect of Building Information Modeling (BIM) on reduced construction time-costs: a case study

机译:建筑信息建模(BIM)对施工时间成本降低的影响 - 以案例研究

获取原文
           

摘要

Building Information Modeling (BIM) is an interesting study to be explored by technological developments. Especially with the Covid-19 pandemic, construction actors are encouraged to work according to the applicable protocol. BIM as integrated tool for managing projects from the beginning to the end of the work. On one side the classic problems of construction projects are high costs, late time, and quality that is not according to specifications. The purpose of this study is to analyze the effect of the use of BIM in construction projects on time and cost. A case study was carried out on a construction project that had implemented BIM. The results showed the use of BIM could cut time by 50% faster and reduce costs by 52.36%. This time and cost-effectiveness are caused by the number of workers needed and the reduced duration so that it has an impact on fundin.
机译:建筑信息建模(BIM)是技术发展探索的一个有趣的研究。特别是与Covid-19大流行,鼓励建筑参与者根据适用的议定书工作。 BIM作为集成工具,用于管理从工作开始到结束的项目。一方面,建筑项目的经典问题是高成本,延迟时间和不根据规格的质量。本研究的目的是分析BIM在建筑项目中使用BIM的效果及成本。在实施BIM的建筑项目中进行了一个案例研究。结果表明,BIM的使用可以将时间缩短50%,降低成本52.36%。这次和成本效益是由所需的工人数量和减少持续时间引起的,以便它对基金会产生影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号