A Review of Issues Associated with the Construction of Irrigation Project with Special Focus on Sikta Irrigation Project in Nepal

机译:浅谈尼泊尔SIKTA灌溉工程灌溉工程建设问题的综述

获取原文
           

摘要

The study A Review on Issue and Problem Associated with Sikta Irrigation Project of Banke District in Nepal was conducted during the period from March to August, 2019. The main objective of this study was to find the problems of Sikta Irrigation Project in Banke district of Nepal. Published literature from different sources such as thesis, papers, manuals, database, and reports were collected and thoroughly studied. The study found so many problems associated with the Sikta Irrigation Project (SIP). Of all those problems, environmental, socio-political, technical and financial problems are the major ones. SIP is the project of national pride, and it is under-construction in Banke district of Nepal. The most important and ever observed problem in the construction field is the failure of canal bed and sides due to dispersive soil. The study would like to suggest that soil test should be conducted as per the expert’s advice before construction of the canal or other structures. Monitoring and control system from the concerned agency should be properly implemented for the construction of Sikta Irrigation Project in the days to come.
机译:该研究在2019年3月至8月的尼泊尔班克地区班克地区Sikta灌溉项目问题和问题研究。本研究的主要目标是找到尼泊尔班克区锡克塔灌区问题。从本文,论文,手册,数据库和报告等不同来源出版的文献被收集并彻底研究。该研究发现了与Sikta灌溉项目相关的许多问题(SIP)。在所有这些问题中,环境,社会政治,技术和财务问题都是主要的问题。 SIP是民族骄傲的项目,它在尼泊尔的Banke区是建设。建筑领域中最重要且观察到的问题是由于分散土的运河床和侧面的失效。该研究旨图表明土壤测试应根据专家的建议在建设运河或其他结构之前进行。应在未来日内妥善实施来自有关机构的监测和控制系统,以便在未来的日子里建设Sikta灌溉项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号