...
首页> 外文期刊>Proceedings of the International Association of Hydrological Sciences >Study on Hydrologic Forecasting at the Construction Period of Datengxia Hydroproject
【24h】

Study on Hydrologic Forecasting at the Construction Period of Datengxia Hydroproject

机译:二峰峡水利施工期水文预测研究

获取原文
           

摘要

To provide better service of hydrologic forecasting in the construction period of Datengxia Hydroproject that is the largest one under construction on the Pearl River, this paper focuses in analysing the characteristics of the regional floods, and reviewing the hydrologic forecasting work since starting construction, and discussing the hydrologic forecasting methods of the period not only the river closure but also the initial filling. The paper presents some practical work experiences and suitable forecasting methods on the basis of the construction schedule and the river diversion schemes. The study will conducive to improve our service ability of hydrologic forecasting and provide the important technical support of safe construction during the flood season.
机译:本文重点介绍了珠江上最大的珠江上建设的水文预测的水文预测,这侧重于分析区域洪水的特征,并审查自起始建设以来的水文预测工作和讨论期间的水文预测方法不仅是河流闭合而且初始填充。本文在施工时间表和河流转移方案的基础上提出了一些实用的工作经验和合适的预测方法。该研究将有利于提高水文预测的服务能力,并在汛期提供安全施工的重要技术支持。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号