首页> 外文期刊>Procedia Manufacturing >Optimization via Computer Simulation of a Mixed Assembly Line of Wooden Furniture - A Case Study
【24h】

Optimization via Computer Simulation of a Mixed Assembly Line of Wooden Furniture - A Case Study

机译:木制家具混合装配线计算机仿真优化 - 案例研究

获取原文
           

摘要

In this article, a new model based on Taguchi design and simulation is suggested to study a mixed assembly line of wooden furniture. The experiment contains 9 independent variables, related to product’s mixes and colors, scheduling rules and Product Life Cycle (PLC) and 3 dependent variables related to Lead-time, flow time and setup time. L27Taguchi’s plan was selected as the appropriate experimental design and the Minitab software was used to carry out its analysis and to obtain its related results. The actual model required the use of many other software, such as: The Enterprise Resources Planning (ERP) system, ‘SQL Server’, ‘Microsoft Report Builder’ and ‘Arena’. This study proves that product mixes, number of offered colors and the scheduling rule for the first sandblast’s workstation have a significant effect on all dependent variables. In addition, scheduling rule for the preparation’s workstation has an important effect on the Lead-time and the flow time. This model can also be a decision support for the line manager. Although PLC’s factors were considered for screening purpose, they turned out to be generally insignificant. This is explained by the similarity between collections of products. In addition, Tukey test, shows that offering sub-categories 1, 2 and 3 and applying the modified shortest processing time’s rule at the preparation’s workstation reduces significantly the mean Lead-time. Finally, it was shown that, there is no difference between offering 22 or 32 colors in term of Lead-time.
机译:在本文中,建议基于Taguchi设计和仿真的新模型研究木制家具的混合装配线。该实验包含9个独立变量,与产品的混音和颜色相关,调度规则和产品生命周期(PLC)和3个与带款时间,流量时间和设置时间相关的3个相关变量。 L27TAGUCHI的计划被选为适当的实验设计,Minitab软件用于进行其分析并获得相关结果。实际模型需要使用许多其他软件,例如:企业资源规划(ERP)系统,'SQL Server','Microsoft Report Builder'和'Arena'。本研究证明,第一个Sandblast的工作站的产品混合,提供的颜色数量和调度规则对所有相关变量有显着影响。此外,准备工作站的调度规则对牵引时间和流量时间具有重要影响。此模型也可以是线路管理器的决策支持。虽然PLC的因素被认为是为了筛选目的,但它们结果通常是微不足道的。这是通过产品集合之间的相似性解释。此外,Tukey Test显示,提供子类别1,2和3,并在准备工作站上应用修改的最短处理时间规则显着降低了平均的引线时间。最后,表明,在连续时间内提供22或32种颜色之间没有区别。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号