Considering Overhead Costs in Road and Landing Spacing Models

机译:考虑到道路和着陆间距模型的开销成本

获取原文
           

摘要

Existing road and landing spacing models assume that spacing affects only the costs of road construction and skidding. However, costs that are independent of production and fixed on the basis of time will vary with spacing when specified on a "per-unit-volume produced" basis and therefore should be considered in the model. Costs of this nature are labeled overhead, and considering these costs in the model will lower total costs. The relationship of overhead costs to spacing follows the same pattern as the skidding costs and can be added to the cost of owning and operating the skidder in the model. Overhead costs were considered in models pertaining to three unique sets of conditions: skidding to roadside with a single road standard; skidding to roadside with two road standards; and skidding to a landing. In all cases, considering overhead in the model lowered total cost and reduced road spacing. Actual cost savings will depend on harvest conditions but can be significant.
机译:现有的道路和着陆间距模型假设间距仅影响道路建设和平滑的成本。然而,在时间内完成生产和固定的成本将随着在“每单位卷”的基础上指定时的间距而变化,因此应在模型中考虑。这种性质的成本被标记为开销,并考虑到该模型中的这些成本将降低总成本。开销成本与间隔的关系遵循与滑动成本相同的模式,并且可以添加到模型中拥有和操作SLIDDER的成本。在三种独特的条件下有可能考虑的架空成本:用单一道路标准滑到路边;用两条道路标准滑到路边;并打滑到着陆。在所有情况下,考虑到模型的开销降低了总成本和降低的道路间距。实际成本节约将取决于收获条件,但可能很重要。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号