Analysis of Changes in Overpass Bridge Project Contract (Case study Bridge Overpass at Kilometer 54 + 050 Marabahan- Margasari Road)

机译:立交桥项目合同变化分析(案例研究桥立交桥在公里54 + 050马拉巴山 - Margasari Road)

获取原文
           

摘要

Project contract for a construction work must cover matters relating to technical and nontechnicalfactors. The intended technical factors such as design drawings, budget plans, and technicalspecifications. While non-technical factors such as payment caya, problem solving, and force majeure. So aftercompleting the work contract, it was expected that any problems that occur after the contract will be resolved bythe parties.This research case study is located on National road of Banjarmasin-Margasari. The national road has a fieldjunction with coal crossing. According to the regulation of governor of South Kalimantan Number 3 Year 2012,that for the transportation of mining proceeds was not allowed to use public roads, so it was necessary to makea special road or a non-field junction so that public roads and special roads do not intersect. Therefore, theprivate party of mine transport owners made the bridge overpass at the junction of the field. In its journey, therewas a problem that occurs in the volume of the pile on the implementation with the planning data. Therefore,research on the contract of the work, that the work remains completed on time. Research was conducted withinterviews and questionnaires. Research to solve the problems that occur with 5 choices, that is by deliberationfor consensus, mediation, conciliation, arbitration, and by going through the courts. Research on the change ofcontracts, conducted with 6 choices, that is to increase or decrease the volume written in the contract (the fixedcontract value), increase the volume written in the contract (value of the contract increases), add and subtractType of activity (contract value increases), change the technical specifications according to field conditions,and change the schedule of the implementation. While the research for the recommendation of the bridgecontract model was carried out with 5 options that is Lumsum contracts, Unit price, joint contract of Lumsumand unit price, contract percentage, and a turnkey contract.The results of the research on 30 respondents of experts, obtained that the first choice done to solve the problemin the case study was to use the way deliberation with consensus. Then research on the type of contract changeperformed on the actual type of contract that exists is by adding a volume of employment with the value ofincreasing contracts. The latest research on alternative contract recommendations is the combined contracttype of lumsum and unit price.
机译:建筑工作的项目合同必须涵盖与技术和南非科学因素有关的事项。设计图纸,预算计划和技术步骤等预期的技术因素。虽然支付Caya,问题解决和不可抗力等非技术因素。因此,随后运营合同,预计合同后发生的任何问题都将由各方解决。这项研究案例研究位于班卓斯岛 - 马里卡里国家路上。国家道路拥有煤炭交叉场的现场。根据2012年3年3年的监管,对于运输采矿所得款项,不允许使用公共道路,因此有必要采用特殊的道路或非现场交界处,使公共道路和特殊道路不要相交。因此,矿山运输业主的私人党在该领域的交界处制作了桥梁立交桥。在其旅程中,有一个问题在于使用规划数据的堆栈的体积发生。因此,研究工作合同,工作仍然按时完成。研究进行了研究,并进行了调查问卷。解决5种选择发生的问题的研究,这是通过审议共识,调解,调解,仲裁以及通过法院进行共识,调解,调解,仲裁。对6个选择进行的相反的改变研究,即增加或减少合同中写入的卷(固定联信价值),增加合同中书面的卷(合同的价值增加),加入和减法的活动(合同值增加),根据现场条件更改技术规范,并更改实现的时间表。虽然对BridgeContract模型的建议的研究进行了5个选项,但Lumsum合同,单价,Lumsumand单价,合同百分比和交钥匙合同的单位价格和交钥匙合同。研究员30名专家的研究结果,获得了解决问题的第一个选择,案例研究是使用审议方式与共识。然后根据存在于存在的实际合同类型的合同类型的研究,这是通过增加合同价值的一卷。关于替代合同建议的最新研究是Lumsum和单价的合并契约。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号