首页> 外文期刊>Procedia - Social and Behavioral Sciences >Examining Factors Affecting Budget Overrun of Construction Projects Undertaken through Management Procurement Method Using PLS-sem Approach
【24h】

Examining Factors Affecting Budget Overrun of Construction Projects Undertaken through Management Procurement Method Using PLS-sem Approach

机译:使用PLS-sem方法的管理采购法对建设项目预算超支的影响因素

获取原文
           

摘要

This paper focused on examining the effect of various factors on budget overrun in construction projects undertaken using management procurement method in Malaysia. It adopted a quantitative method for data collection using structured questionnaire survey amongst contractors, consultant and clients. A total of 118 samples were collected against 200 questionnaires that had been distributed nationwide. Gathered data was analyzed with an advanced multivariate method of structural equation modeling with PLS approach using SmartPLS software. The major finding showed all the constructs in model contributed significantly to budget overrun with R2value of 0.623. Also, the developed model has substantial explaining power with GoF value of 0.62. This indicates that the model was able to be generalized in representing the budget overrun factors occurring in construction projects nationwide. By identifying these factors, it will help the construction community to take measures in improving the cost performance of the projects.
机译:本文着重研究了各种因素对马来西亚使用管理采购法进行的建设项目预算超支的影响。它采用了一种定量的方法,通过对承包商,顾问和客户进行结构化的问卷调查来收集数据。在全国范围内分发的200份问卷中,共收集了118个样本。使用SmartPLS软件,通过采用PLS方法的结构方程建模的高级多元方法对收集的数据进行分析。主要发现表明,模型中的所有构造均对预算超支做出了重大贡献,R2值为0.623。而且,开发的模型具有很高的解释力,GoF值为0.62。这表明该模型可以概括表示全国建设项目中出现的预算超支因素。通过识别这些因素,它将帮助建筑界采取措施改善项目的成本绩效。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号