首页> 外文期刊>MATEC Web of Conferences >A Case Study On Zoning And Construction Of Roller-Compacted-Concrete Gravity Dams
【24h】

A Case Study On Zoning And Construction Of Roller-Compacted-Concrete Gravity Dams

机译:碾压混凝土重力坝分区与建设实例

获取原文
           

摘要

In order to make full use of the concrete strength, reduce the amount of cementitious materials and simplify the temperature control measures, a roller compacted concrete (RCC) dam needs to be zoned reasonably in consideration of locations and working conditions. Taking the RCC gravity dam of Wuxikou hydropower project in Jiangxi province, this article specifies the zonation design, the problems encountered during construction stage and the corresponding measures. The results indicate that the zonation and the construction schemes of the RCC gravity dam can greatly reduce the amount of cementitious materials, improve the level of mechanization in construction, and thus accelerate the construction progress, reduce the project cost. It not only ensures the quality and safety of the project, but also achieves obvious economic benefits. It can be an important reference for zonation design and construction of similar projects.
机译:为了充分利用混凝土强度,减少胶结材料的数量并简化温度控制措施,需要根据位置和工作条件合理地划分碾压混凝土(RCC)大坝。本文以江西省无锡口水电站碾压混凝土重力坝为例,详细介绍了分区设计,施工阶段遇到的问题及相应的措施。结果表明,碾压混凝土重力坝的分区和施工方案可以大大减少胶凝材料的用量,提高施工机械化水平,从而加快施工进度,降低工程成本。它不仅保证了项目的质量和安全,而且取得了明显的经济效益。它可以为分区设计和类似项目的建设提供重要参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号