...
首页> 外文期刊>MATEC Web of Conferences >Research on widening construction clearance on the transition curve of existing railway lines based on SIMPACK
【24h】

Research on widening construction clearance on the transition curve of existing railway lines based on SIMPACK

机译:基于SIMPACK拓宽既有铁路过渡曲线施工间隙的研究

获取原文
           

摘要

This paper selects appropriate vehicle as the standard vehicle and designs its shape. Secondly, it chooses some control point on the vehicle according to the current standard. Thirdly, the essay sets four difficult operating conditions with different curve radius and superelevation, simulates on the SIMPACK software and compares the value of control points offset the centre of railway line to the current construction clearance. According to the result of comparison, this paper divides transition curve into three parts to widen construction clearance and proposes the definition of correction coefficient. At last, the paper compares construction clearance that has been corrected with existing construction clearance to check whether the new one is right or not. The study shows that if curve part is divided into three parts to widen construction clearance, it would be more reasonable and satisfactory.
机译:本文选择合适的车辆作为标准车辆并设计其形状。其次,它根据当前标准在车辆上选择一些控制点。第三,本文设定了四个具有不同曲线半径和高程的困难工作条件,在SIMPACK软件上进行了仿真,并将偏移铁路中心的控制点的值与当前施工间隙进行了比较。根据比较结果,将过渡曲线分为三部分以扩大施工间隙,并提出了修正系数的定义。最后,本文将已更正的施工许可与现有的施工许可进行比较,以检查新的是否正确。研究表明,如果将曲线部分分为三个部分以扩大施工间隙,则将更加合理和令人满意。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号