首页> 外文期刊>MATEC Web of Conferences >Track-quality index and degradation of railway track structure: The construction track doubling project of northeast line from thanon chira junction to khon kaen station, Thailand
【24h】

Track-quality index and degradation of railway track structure: The construction track doubling project of northeast line from thanon chira junction to khon kaen station, Thailand

机译:轨道质量指标与铁路轨道结构退化:从泰国通隆-奇拉路口至孔敬站的东北线建设轨道加倍工程

获取原文
           

摘要

In the past, the railway network has not been developed, and new construction added has been mostly degraded caused by long useful life, and lack of maintenance due to a budget constraint. Currently, 93% of railway in Thailand is single track which results in delays due to low capacity and low average speeds, delayed train on a single track will also delay the train passing it. In some areas of the network, the amount of travel and transportation exceeds the capacity received, so delays in travel and transportation is quite high. Due to this above reason, the service of railway is not effective in terms of convenience and speed of service. Punctuality and cost is high compared with road transport. The biggest challenge that railways faces is the insufficient number of tracks and outdated or old trains. Most the trains cannot travel at their optimum speed because they do not get clearances on time. Thai government has a policy to develop railway track network and services to improve transportation efficiency and save fuel energy used in the transportation sector of the country. Thus, it is necessary to develop the rail transportation system from the existing network as a single track to the current double track network. This study focuses on investigating the degradation of the existing railway structure during the construction track doubling Project. Data were inspected by Track Inspection Car EM120N before the commencement of construction for analysing the condition with the Track Quality Index / TQI) in order to predict the degradation of the railway to plan maintenance and further renewal of the railway. The study found that the TQI value of the existing track structure during the two years of the doubling track construction (2017-2018) has changed significantly.
机译:过去,铁路网络尚未开发,由于使用寿命长,并且由于预算限制而缺乏维护,因此增加的新建筑大部分已退化。目前,泰国93%的铁路为单线铁路,这是由于运力低,平均速度低而导致的延误,单线铁路的延误也会延误列车通过。在网络的某些区域,旅行和运输的数量超过了所接收的容量,因此旅行和运输的延迟非常高。由于上述原因,铁路服务在便利性和服务速度方面是无效的。与公路运输相比,守时和成本高。铁路面临的最大挑战是铁轨数量和过时或过时的火车数量不足。大多数火车无法按最佳速度行驶,因为它们没有按时清关。泰国政府制定了发展铁路轨道网络和服务的政策,以提高运输效率并节省该国运输部门使用的燃料能源。因此,有必要将铁路运输系统从现有的单轨网络发展到目前的双轨网络。这项研究的重点是调查在建设轨道加倍工程期间现有铁路结构的退化情况。在施工开始之前,请数据由轨道检查车EM120N进行检查,以使用轨道质量指数(TQI)分析状况,以预测铁路的退化,以计划铁路的维护和进一步更新。研究发现,在加倍轨道建设的两年(2017-2018)中,现有轨道结构的TQI值发生了显着变化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号