...
首页> 外文期刊>MATEC Web of Conferences >Analysis of Limiting Measures of Three-phase Short-circuit Current of 500kV Intensive Receiving-end Power Grid in the Early Stage of UHV Construction
【24h】

Analysis of Limiting Measures of Three-phase Short-circuit Current of 500kV Intensive Receiving-end Power Grid in the Early Stage of UHV Construction

机译:特高压建设初期500kV高压接收端电网三相短路电流的限制措施分析

获取原文
           

摘要

This paper took the intensive receiving-end power grid as the research object and analysed the problems of three-phase short-circuit current over-limited of 500kV intensive power grid in the early stage of UHV construction. Firstly, this paper analysed the influence factors of the short-circuit current based on self-impedance analysis model of two-port network theory and the equivalent model of UHV power grid. Then, the applicable current-limiting measures were put forward. Finally, this paper proposed one scheme to solve the problems of three-phase short-circuit current over-limited of 500kV buses in one practical receiving-end power grid and verified the feasibility of this scheme from three different aspects. Aiming at the over-limited influential factors, the applicable current-limiting measures can be taken as follows: separating the 500kV bus at UHV substation, lapping the lines outside the substation and decentralizing the power supplies. The proposed measures can effectively solve the problems of short-circuit current over-limited in the early stage of UHV construction and provide reference for other power grid.
机译:以特高压接收端电网为研究对象,分析了特高压建设初期500kV特高压电网的三相短路电流超限问题。首先,基于两端口网络理论的自阻抗分析模型和特高压电网的等效模型,分析了短路电流的影响因素。然后,提出了适用的限流措施。最后,本文提出了一种解决方案,以解决一个实际接收端电网中500kV母线三相短路电流超限的问题,并从三个方面验证了该方案的可行性。针对超限影响因素,可以采取以下限流措施:在特高压变电站隔离500kV母线,将变电站外部的线路搭接,并分散电源。所提出的措施可以有效解决特高压建设初期短路电流超限的问题,为其他电网提供参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号